Big Red Builds logoBig Red BuildsBuilt Right. Built Red.
Bathrooms

Basement Bathroom Build

Before / After · drag to compare

Unfinished basement room with bare framing, insulation, and a concrete floor
The same room finished as a bathroom with tile, shower, and vanity
BeforeAfter

Super proud of this one. Our first full bathroom, built from bare studs and a concrete floor in an unfinished basement.

The room was insulated, drywalled, and tiled with large-format marble-look floor tile. We added a walk-in shower with a sliding glass door and built-in niche, pot lights, a new vanity, and a backlit round mirror.

It wouldn't have been possible without all the guys pitching in, with trusted local trades on the tile, electrical, and plumbing. As winter approaches, give Big Red a call and see what we can do in YOUR home.

On the Job

White vanity with a backlit round mirror
Overhead view of the new shower, toilet, and vanity
Large-format grey marble-look floor tile
New pot lights and ceiling in the finished bathroom
Floor tile being laid with levelling clips mid-install
Drywall and shower walls going up during the build

Let’s work together on your next project

Every project starts with a conversation. Share your vision, and we’ll bring the expertise, planning, and hands-on work needed to make it real: on time, on budget, and built to last.